Categories
Ozark News

Pomme de Terre Wastewater Issue Drawing Concern

 This story courtesy of Carissa Codel of OzarksFirst.com-

A public hearing between the Department of Natural Resources and those concerned for the Pomme de Terre River is being scheduled after multiple questions were raised about a slaughterhouse potentially polluting the river.

Pleasant Hope residents want answers about Missouri Prime Beef Packers’ proposal to dump 350,000 gallons of treated wastewater into local waterways each day.

“There’s a correct way to treat your waste,” said John Bledsoe, a member of the Missouri Stream Team. “I think that dumping it in the river is a shortcut.”

Missouri Prime Beef Packers is hoping to use a new technology called iLeaf to treat the waste before disposing of it in the Pomme de Terre River.

“When we talk about significant degradation, that was a word that was questioned a lot,” said Water Pollution Control Branch Chief Heather Peters with DNR. “All we’re saying is that it’s not insignificant.”

Insignificant degradation is discharge that wouldn’t cause any harm to water whatsoever.

Leave a Reply

Your email address will not be published. Required fields are marked *